DIY 55 Gallon Tank Stand (step by step with photos)

Discussion in 'I made this!' started by SKAustin, Jan 13, 2007.

to remove this notice and enjoy 3reef content with less ads. 3reef membership is free.

  1. SKAustin

    SKAustin Astrea Snail

    Joined:
    Dec 29, 2006
    Messages:
    44
    Location:
    Upstate NY
    Step 16: A bit more reveling.

    Once the stain has dried completely, it’s time to take another peek at the overall look. The difference this time is, we are doing it with a bit more purpose. Tip the project back, prop it up with a scrap 2x4 and put the doors in place. Take a good long look. Make sure you are happy with the color. If not, this is the time to make any adjustments. A second coat will darken up the existing color. A coat of another color will adjust the hue a bit. But if you’re happy with the look, it’s time to seal the deal.

    [​IMG]
     
    Last edited: Jan 13, 2007
  2. Click Here!

  3. SKAustin

    SKAustin Astrea Snail

    Joined:
    Dec 29, 2006
    Messages:
    44
    Location:
    Upstate NY
    Step 17: A few coats of Polyurethane

    Well, we’re nearly finished now. A few coats of Polyurethane will seal up the wood for protection from the inevitable spilling of water, and give it that real furniture look. If you are using Stain Crayon to fill your nail holes, here is the time to do it. Fill your holes, and then wipe off any excess with a clean dry cloth.

    It's time for a clean brush and a well-stirred can of Polyurethane. Take your time here. Apply thin even coats with a diligent watchful eye for any drips or runs. Take your time here. This step could make or break the overall appearance of the entire project. If you’ve never applied polyurethane before, here are a few pointers that will prove helpful.

    *Take your time.
    *Apply thin even coats.
    *Do not get too much Poly in the brush at one time. That would be asking for problems.
    *When moving the brush from the can to the project, slowly rotate the brush to prevent the poly from dripping off of the brush.
    *Never draw your brush over a corner into the project, as this will cause runs.
    *Draw your brush from the project, toward the corner and continue straight off the edge.
    *When at all possible, adjust the project so that you are working on a flat, horizontal surface. This will reduce the chance of drips and runs.
    *Allow the project several hours to dry before attempting to move it.
    *Lightly sand the finished wood with fine steel wool between coats.
    *Take your time! Don’t rush it.

    Ok, with that said, 2 coats of poly to any inside and backside surfaces, 3 coats of poly to any outside surfaces or inside surfaces that water may repeatedly be spilt upon.


    [​IMG]
     
    Last edited: Jan 13, 2007
  4. SKAustin

    SKAustin Astrea Snail

    Joined:
    Dec 29, 2006
    Messages:
    44
    Location:
    Upstate NY
    Step 18: Adding the hardware

    Measure and mark the holes for your hinges and door handles. Pre-drill the holes taking extreme care not to drill the holes for the hinges all the way through the doors, and install the hardware. Make sure to thoroughly check your door clearance at the top and the bottom prior to the final tightening of your hinges. Then just add a few felt pads to the corners of the door for a nice quiet operation.

    [​IMG]
     
    Last edited: Jan 13, 2007
  5. SKAustin

    SKAustin Astrea Snail

    Joined:
    Dec 29, 2006
    Messages:
    44
    Location:
    Upstate NY
    Step 19: Preparing for the tank

    One last order of business before we can put this project to work. Have the Empty tank ready for this step. Apply a bead of Liquid Nails For Projects around the perimeter of the stand where the tank frame will sit and lay the cork (or foam) on top of the bead. Do not push the cork down onto the bead. Carefully set the empty tank onto the stand and allow the tank to compress the cork onto the bead. Allow the liquid nails a few hours to set, and then remove the tank. If possible, let the Liquid Nails dry overnight before replacing and filling the tank.

    [​IMG]
     
    Last edited: Jan 13, 2007
  6. SKAustin

    SKAustin Astrea Snail

    Joined:
    Dec 29, 2006
    Messages:
    44
    Location:
    Upstate NY
    Step 20: Put your hard work to some use.

    That’s it. You’re done. Get that tank filled back up, and enjoy the fruits of your labor.

    [​IMG]
     
    1 person likes this.
  7. SKAustin

    SKAustin Astrea Snail

    Joined:
    Dec 29, 2006
    Messages:
    44
    Location:
    Upstate NY
    Step 21: Top it off with a nice matching canopy.

    Once completed and ready to go, you can start construction of a nice matching canopy.

    [​IMG]
     
    Last edited: Jan 13, 2007
    2 people like this.
  8. Click Here!

  9. Solsjealous

    Solsjealous Astrea Snail

    Joined:
    Dec 27, 2006
    Messages:
    48
    Location:
    Reva VA
  10. CodyW

    CodyW Spaghetti Worm

    Joined:
    Mar 17, 2006
    Messages:
    177
    Location:
    Tallahassee, FL
    Karma for your skills and time.
     
  11. Matt Rogers

    Matt Rogers Kingfish

    Joined:
    Dec 31, 2000
    Messages:
    13,466
    Location:
    Berkeley, CA
    Fantastic! What a great looking stand. You have been busy, eh?
    Thank you for all the detail, I am sure many will find this helpful.
     
  12. Urban_s

    Urban_s Sea Dragon

    Joined:
    Mar 13, 2006
    Messages:
    534
    Location:
    Kalispell, MT