Moving my tank tonight - wish me luck!

Discussion in 'General Reef Topics' started by Matt Rogers, Nov 30, 2010.

to remove this notice and enjoy 3reef content with less ads. 3reef membership is free.

  1. Corailline

    Corailline Super Moderator

    Joined:
    Sep 8, 2010
    Messages:
    19,652
    Location:
    It is a dry heat, yeah right !
  2. Click Here!

  3. Magnus

    Magnus Sharknado

    Joined:
    Jan 13, 2010
    Messages:
    1,923
    Location:
    Knoxville, TN
    Just take it easy, bud. Keep a few extra buckets of water ready for the unknown, and when everything turns out nicely, you'll use them for your next WC. Only it's better to be ready, and if you don't feel ready with a good plan, give it another day or even wait until the weekend and ask somebody to give you a hand.
     
  4. jkat21

    jkat21 Bangghai Cardinal

    Joined:
    Feb 6, 2009
    Messages:
    1,379
    Location:
    S.I. N.Y
    It will go finr.just take your time.I found the worst/time consuming part was resetting up the rock work..just have some back up saltwater and lg tote for the fish to stay in overnight if you don't finish in time. Good luck it will look great when in the new place...
     
  5. Magnus

    Magnus Sharknado

    Joined:
    Jan 13, 2010
    Messages:
    1,923
    Location:
    Knoxville, TN
    Leveling a floor to put a stand on it

    Update: I have added the drawings finally... It took me a while to learn the program to make them but I think they're somewhat mediocre if not OK. I hope it helps. Click on images to enlarge


    Matt, let me ask you the following:
    Why does the tank need to be moved tonight?

    I have an Idea that may work very well for you, bud. Give me a few minutes to see if I can draw something. I've never used the drawing tool on 3reef, but I'll give it a try.

    If you're curious, about it, this is what I thought:

    Choose the spot where you want your stand to be at. Make sure you take into account space between the back of the stand and the wall for extra equipment, etc. If you want to mark it somehow, do it.

    1- Go to your local hardware store and buy a 1x1" (they can come 8 feet long), also buy some 1mm plastic sheeting (if you want to spend the money and you will use if for something else later), or you can use a piece of nylon or big trash bag, just cut it to the desired length and duct tape it together the best you can. IT MUST BE WATER TIGHT! The plastic must be resistant but soft enough for it to mold to the gaps of the floor. Also, buy a piece of black, mate finish toe-kick, since your stand is black otherwise try to match the finish in your stand.

    2- With the 1"x1" build a square matching your tank's base, but make it 1/8th of an inch smaller on each side, this is the thickness of your toe-kick (usually between 1/8" and 1/4" so what you subtract will depend on the toe-kick you get).
    [​IMG]

    3- With the plastic film, make a pool inside the frame and staple it to the top surface of the square you built, giving it an extra 1/8th of an inch that you will let hang towards the floor and staple the film to the very top of the square or rectangle, matching your stand's base surface, (but do subtract the 1/8th of an inch or total thickness of the toe-kick) Make sure, you're building a pool with the film and that it stays stuck to the floor and to the sides of the 1x1's (plastic film in general has lots of static charge, so this will be easy and work beautifully).
    [​IMG]

    4- Once this pool is built, get one of these: Product Comparison Page (I would get the anti-microbial one), mix the self leveling underlayment just a tiny bit more wet than the directions, but only A TINY BIT (I'm familiar with this underlayment mix) and pour inside the "mold" or frame you built, spread and smooth it the best you can with a trout or something long enough to fit in the mold and with a flat surface. The self leveling compound will do the rest.
    [​IMG]


    Place some weights on the side of the frame where the floor is leveled and see that the film can still touch the floor and all the interior sides of the frame (do this before pouring cement inside). This is so when you pour the 1 inch of underlayment, you end up with a perfect platform that touches the floor and molds to the wood floor, but still keeping the mold's/frame's shape and keeps true level where the floor is actually leveled. If the floor isn't very much leveled at all, do not worry about this step since it isn't an essential one. The weights will also keep the frame from moving around when you pour the mix.
    [​IMG]

    Even if there's a gap between the base of the frame and the unleveled floor, formed by bumps or depressions on it, the film will keep the underlayment from going too far out through the gap and on the floor, but it will form a lip that is easy to brake or chisel off.
    [​IMG]

    5- Give it 12 hours to set and cure or follow directions to make sure curing time is met, and then start taking the mold apart carefully. If you screw the 1x1's as in the pic, this should be an easy task as well. Apply some pressure with your knees so it doesn't move anywhere when you're working with the frame.
    [​IMG]

    Then cut the film from around the sides to expose the cement.
    [​IMG]

    6- Once you get the final platform all nice and ready, cut the toe kick to go around the whole perimeter, starting with the backside, then the sides and lastly the front in one long piece to cover the end grain of the side toe-kick pieces. You'll have to cut it to the right "height" going in favor of the grain, you can use a very sharp blade to do this if you don't have other tools. Lastly you can install by applying a few drops of super glue gel or even liquid nails to the toe-kick, for a permanent adhesion to the leveled concrete platform.
    [​IMG]

    7- After the cement is fully cured, you will have a perfectly leveled and finished surface for your stand.


    NOTE: Self leveling Underlayment cement is usually very safe at 1 inch (~2.5cm) thickness. If you want to build a taller, leveled concrete slab, you should fill with regular cement and leave that 1 final inch or 3/4" for the self leveling underlayment. Also, you should let the regular cement to fully cure before you pour the self leveling cement on.


    That's it!! It should be a 4 hour project tops (excluding drying/curing time) and that is if you have absolutely NO experience whatsoever with this materials, or woodwork. It is all very, super basic stuff. It may sound more complicated than it actually is, but just wanted to give you as much detail as possible in case I can't figure out how to draw things with this tool I was talking about earlier.

    Oh!! And by the way, this won't harm your floor, unless you step on it and do the twist while you're up there ;)
    But for very heavy tanks, you can use a thicker plastic film (2 and even 3 millimeters, but beweare, the thicker the film, the less is going to really mold to the floor).

    Sorry for being late, but I'm hoping this may help someone in the future.

    - Mag.
     

    Attached Files:

    Last edited: Dec 12, 2010
    2 people like this.
  6. Matt Rogers

    Matt Rogers Kingfish

    Joined:
    Dec 31, 2000
    Messages:
    13,466
    Location:
    Berkeley, CA
    Wow! That is cool Magus - amazing. I wish you posted this days ago. :)
    I need to move it tonight because tomorrow is the 1st and I need to be out of there.

    Leaving now!! Bye all - update later... much later...

    matt
     
  7. Magnus

    Magnus Sharknado

    Joined:
    Jan 13, 2010
    Messages:
    1,923
    Location:
    Knoxville, TN
    Crap! Sorry, dude. I wish I would have been more attentive to the forum this past week or so. I've been spaced out a bit with life in general. And only got in a time or two in the past week or week and a half.

    My apologies. But, if you still want to do this at some point, I'll still try to draw it. I'm just trying to figure out how. I can't see anything on "picnik" thing to do this. I'll ask Seano, I've seen he does this all the time.

    - Mag.
     
  8. Click Here!

  9. steve wright

    steve wright Super Moderator

    Joined:
    Feb 17, 2009
    Messages:
    11,284
    Location:
    shenzhen Guangdong PRC
    good luck with the tank move, Matt
    hope it worked out OK


    Steve
     
  10. 2in10

    2in10 Super Moderator

    Joined:
    Aug 6, 2009
    Messages:
    19,258
    Location:
    Sparks, NV
    Good luck Matt.
     
  11. xmetalfan99

    xmetalfan99 Giant Squid

    Joined:
    Aug 19, 2009
    Messages:
    3,691
    Location:
    morgantown, wv
    Good luck. I'd take a tank crash over moving a tank.
     
  12. Seano Hermano

    Seano Hermano Giant Squid

    Joined:
    Apr 7, 2010
    Messages:
    10,056
    Location:
    Northwest Ohio
    Ah, requesting my assistance? What's up?:cheesy: Hope the move works out well, Matt.