first picture is the equipt .. hehe
second are a first part of the job
then a second.. and the final job..
and a zoom to make you understand what i did..
this are 4 pipes 65mm diameter (PVC-U pn16) to bring (2 pipies) water from the sump under the main tank to the skimmer/reactor sump and back (other 2 pipes)
the main sump is located in another room then the dining room to have less trouble when doing husbandry and remove the noise a huge skimmer does and save space.. the pipes are nearly 4.5 meter longs and will be covered by the floor i'll make you see in the next post. |